Mining and Energy / Underground Dewatering
The mandate: Pumping 400 US gpm of dirty water containing 20% solids at a manometric head of 280 metres to dewater the Black Fox mine. Pumpaction’s added value: Install the Octopus™ multi-stage pump system designed by Pumpaction, tailored to the customer’s requirements and an excellent value. The system acts as the emergency auxiliary system for the Dolphin™ system, installed four weeks prior. |
Location: Matheson, ON Customer: Primero Gold |